Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Design, Development and Demonstration of a Centralized Protection and Monitoring (CPM) System within a Distribution Substation including DER Central Power Research Institute, Bangalore 2023-2025 192.50 Lakhs Not Completed
2 Centre of Excellence on Energy Aware Urban Infrastructure SERB, Department of Science and Technology(Project Lead: IIT Kharagpur) 2023-2028 49.04 Lakhs Not Completed
3 Development of Coordinated Protection and Control Scheme for Microgrid SERB Science and Technology Award for Research 2022-2025 38.5 Lakhs Not Completed
4 Development of Internet of Things Enabled Phasor and Power Quality Monitoring Devices for Smart Power Grids Core Research Grant, SERB, DST 2021-2024 29.24 Lakhs Not Completed
5 Design and Development of Dynamic phasor and Frequency estimator complying IEEE C37.118 standard Teachers Associateship for Research Excellence (TARE), SERB, DST 2019-2023 18.3 Lakhs Not Completed
6 Smart Grid Visualization–Applications of Virtual Reality VARCoE, IIT Bhubaneswar 2020-2023 20.0 Lakhs Not Completed
7 Design and Development of Tools for Detection and Prevention of Cyber Attacks in Smart Grid Energy Management Systems (EMS) CPRI Bangalore 2019-2022 49.92 Lakhs Completed
8 Design and Development of Low cost Time Synchronized devices for WAMs in Smart-Grids (IIT BBSR- Virginia Tech, USA) SPARC, MHRD 2019-2021 66. 26 Lakhs Completed
9 INDO-US: US-India collaborative for smart distribution System with Storage DST (India) –DoE (USA) consortia 2017-2022 340 Lakhs Completed
10 Brushless DC Machine based Solar pumping system Solar Energy Research Initiative -2016, DST 2017-2020 66.24 Lakhs Completed
11 Development of intelligent relaying scheme for micro-grids with DG penetration Central Power Research Institute, Bangalore 2016-2019 28.00 Lakhs Completed
12 Development of a comprehensive wide-area based back-up protection scheme for power transmission network, SERB Department of Science and Technology, New Delhi 2015-2018 50.328 Lakhs Completed
13 Design and development of an adaptive distance relay for Flexible AC transmission systems Department of Science and Technology, New Delhi, (Fast track project proposal for young scientist) 2012-2015 18.89 Lakhs Completed
14 House hold energy consumption survey Warwick Manufacturing Group, UK 2012 1.2 Lakhs Completed
15 Vetting of CAPEX Plan of TPCODL GRIDCO, Odisha 2021 1.60 Lakhs Completed
16 Submission of Analysis of the Project Specific Tariff of Lower Baitarani SHEP GRIDCO, Odisha 2022 3.61 Lakhs Completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1. Dynamic maximum power point tracking of grid connected photo voltaic (PV) system 2012-2015 10 Lakhs Completed
2 Smart Grid Security Control Using Nature – Inspired Decentralised Cooperative Metaheuristic Strategies DST – TARE 2019-22 10.05 Lakhs Completed
3 HUB and SPOKE consortium for 2W and 3W Electric Drives-Design, Development and Prototyping of advanced IM and Synshronous Reluctance Drives and Vehicle integration for e2W and e3W vehicle applications NFTDC 20.20 2018-20 Completed
4 Driver behaviour modelling for autonomous driving KPIT 26.70 2017-20 Completed
5 Solar Powered DC System for Domestic Electrification and Rural Application Planning & Coordination Dept. 21.66 2015-17 Completed
6 Integration and intelligent management of renewable via ICT for smart Micro-Grid networks DST 88.24 2014-18 Completed
Consultancy Project
1. Preparation of DPR for the proposed National Institute for New Energy & Innovation at Bhubaneswar Ministry of New Renewable Energy, Govt. of India 2015 05 Lakhs Completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Design and Implementation of a Wireless Sensor Network Testbed. IIT Bhubaneswar 2 year 10 Lacs Completed
2 Design and Development of Efficient, Smart, and Scalable Communication Protocols for Large, and Heterogeneous IoT-System. PMRF Funding 5 years 55 Lacs Ongoing
3 Design and Development of an Efficient Framework for Decentralized Real-Time Coordination and Collaboration for a Swarm of Autonomous Robots DST SERB CRG 3 years 30.2 Lacs Ongoing
4 Lightweight reconfigurable cognitive radio platform for M2M and IoT applications (Co-PI) IMPRINT-II, SERB, DST 3 years 81.98 Lacs Ongoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Marquee Semiconductor MoU Marquee Semiconductor 2023-2027 49 Lakhs(varies) Ongoing
2 Smart City Phase-2 Ministry of Electronics and Information Technology (MeitY) Government of India 2024-2027 402 Lakhs Ongoing
3 Energy Efficient Mesh Architecture Based Indigenous Neuromorphic Processor for Extreme Edge IoT Applications Ministry of Electronics and Information Technology (MeitY) Government of India 2023-2028 288 Lakhs Ongoing
4 Design of Dynamic MAC and PHY SoC for low power and long-range networks Ministry of Electronics and Information Technology (MeitY) Government of India 2020-2024 38 Lakhs Ongoing
5 Simultaneous Bidirectional Data Link over On-Chip Global MIMO Interconnect Carinthia University of Applied Sciences, Austria 2017-2020 35 Lakhs completed
6 In-Band Full-Duplex Signaling with Digitally Assisted Self-Interference Cancellation UGC 2017-2019 10 Lakhs completed
7 Ideation in collaboration with Infineon Technologies European Union 2016-2019 338 Lakhs completed
8 Design and Development of DRFM and Superbus Systems for Long Range Missiles Advanced Systems Laboratory, Defense Research and Development Authority , Govt. of India 2013-2014 49.25 completed
9 Virtual Lab on Analog and Mixed Signal VLSI Design MHRD 2011-2014 15 completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Techniques and Tools for verification of network security policies based on formal methods to assess security of networks SAG, DRDO, Delhi 10-03-2017 to 10-08-2019 27.95 Completed
2 Design and Developments of Tools for Detection and Prevention of Cyber Attacks in smart grid EMS CPRI, Bangalore 02-11-2020 to 01-05-2024 49.92 Ongoing
3 Development of Formal Verification Tools for Proactive Assessment and Prevention of Security Threats in Enterprise Networks DRDO, Delhi 03-10-2021 to 02-10-2024 38.64 Ongoing
4 Distributed Software Defined Network Controller with End-to-End Security Bharat Electronics Bangalore 10-07-2018 to 09-01-2021 42.84 Completed
5 Automated Security Verification and Diagnosis of Smart Grid Advanced Metering Infrastructure – a formal analytics based approach IIT Bhubaneswar 10-03-2014 to 09-03-2016 9.95 Lakhs completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Efficient cache aided data delivery using deep reinforcement learning. PI DST 2 years 18.03 lakhs Completed
2 Optimization of Service Completion Time for Distributed Gradient Descent Algorithm in the Presence of Straggler Nodes. PI IIT Bhubaneswar 2 years 10 lakhs Completed
3 Design, Development, and Demonstration of Solar-PV On-board and Off-Board Electric Rickshaw Charging Infrastructure.” Co-PI DST 3 years 78 lakhs Ongoing
4 Classical and Quantum Error Correcting Codes and Mathematics over Finite Fields for Smart Telecommunications. Co-PI DST 3 years 1,04,35,281 Ongoing (Sanction Order released. Money yet to receive).
5 Communication Efficient Gradient Aggregation for Hierarchical Networks DST 3 years 39,47,956 Ongoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Effect of Fading Correlation on the Performance of Equal Gain Combining Receiver over Hoyt Fading Channels,. DST 2008-2011 10 Lac Completed
2 Aeronautical Telemetry Estimation and Equalization, DRDO, ITR, Chandipur, 2016-2017 – PI – Ongoing. DRDO, Chandipur 2016-2018 10 Lac Completed
3 Design and implementation of AI powered autonomous underwater vehicle (AUV) and IoT enabled underwater acoustic sensor networks TIH, IIT Guwahati TIDF 2022-2026 90 Lac Ongoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1. AI and ML based data analytics algorithm for Medtech System Humor Tech Pvt. Ltd. 2 Years 2,00,000/- Completed
2. Design and Performance Investigation of Negative Capacitance Tunnel FET for Digital/Analog Applications FIG, PDPM IIITDM Jabalpur 3 Years 7,50, 000/- Completed
3. Design and Performance Investigation of Low power III-V Negative Capacitance FE for sensing applications CSIR 3 Years 29.21 lakh Ongoing
4. Machine Learning Augmented Compact Modeling of a Cryogenic Nanosheet FET for implementing an Analog Front-end Readout Circuitry SERB 3 Years 44 Lakh Sanctioned
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Minimization of Storage Requirements in Renewable-Rich Microgrid Systems through Coordinated Control of Resources SERB, DST, GoI under Early Career Research Award (Restructured Young Scientist) 3 Years 50,00,000 Completed
2 Grid Interconnection protocols for largely dispersed minigrids/microgrids for electrification of rural India, Indo-Norway Joint Research Projects on Renewable Energy, DST, GoI and Research Council of Norway 3 Years 40,00,000 from DST, GoI and NOK 24,56,746 (2 Crore approx.) from Research Council of Norway Completed
3 Design and Development of Grid Interactive Adaptive Controls for Frequency Regulation from Large Scale PV Systems Research Scheme on Power Project, Central Power Research Institute (CPRI), India 3 Years 39,16,000 Ongoing
4 Reliability Enhancement in PV Rich Microgrids with Plug-in-Hybrid Electric Vehicles and Data Centres European Union’s ERIGrid under H2020 One Month 6,90,000 (€ 8500) Completed
5 Grid Interconnection protocols for Largely Dispersed minigrids/microgrids European Union’s ERIGrid under H2020 One Month 12,00,000 (€ 14600) Completed
6 Intelligent DC Microgrid NIT Warangal 3 Years 5,00,000 Completed
7 AUDIT FOR 33KV POWER SUPPLY WORK IISER BERHAMPUR 3 Months 2,50,000 Ongoing
8 AR-VR Based Application Modules for Learning, Manpower Training and Emergency Response in Electrical Substations VARCoE, IIT Bhubaneswar 3 years 8,00,000 2024
9 Vetting of Guidelines for Solar Powered Fencing Dept. of Energy, Govt. of Odisha 5 Months 6,28,940 2024
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Enhancement of the bandwidth of planar antennas using electromagnetic bandgap structures DST 03/2013 – 02/2016 4.4 Lakhs Completed
2 Microwave-Optical Engineering and Sensing Laboratory DST-FIST 10/2018 – 10/2023 232 Lakhs Completed
3 Add on Radar for Jamming UAVs ATB 11/2020 – 11/2023 78.19 Lakhs Completed
4 Bone health classification using machine learning SERB-CRG 03/2021 – 05/2023 32.57 Lakhs Completed
5 Design and Development of a Software Defined Radar for Road Safety Applications MV-Govt of Odisha 03/2021 – 03/2023 14.78 Lakhs Completed
6 Design and Development of a Doppler Radar System for Inbore Measurement ARMREB-DRDO 02/2022 – 02/2025 44.575 Lakhs Ongoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Power Quality Enhancement and Control of Distributed Generation in Grid Interactive Systems (PI) SEED Grant IIT Bhubaneswar 2 years 10 Lakhs Completed
2 Brush Less DC Machine based solar pumping system (Co-PI) DST 3 years 66.24 Lakhs Completed
3 Design and Development of Affordable Movable Solar Photo-voltaic Water Pumping System (PI) RKVY, Odisha State Govt 4 Years 80.58 Lakhs Completed
4 UK India Clean Energy Research Institute (WP-4) (Institute Lead-PI) DST 4.5 Years 54.73 Lakhs Completed
5 Design and Implementation of High Speed Low Power Embedded Signal Processor Based Custom Devices for PQ Improvement (PI) DST-SERB 3 Years 32.99 Lakhs Completed
6 Renewable Energy EMPOWERing European and InDian communities (RE-EMPOWERED) (Institute PI and Demo Site Coordinator (Keonjhar, Odisha) DST 3.5 Years 158.15 Lakhs Ongoing
7 Design and Development of Cost-Effective Floating-Solar Energy Generation Technologies and Infrastructure for Achieving Nearly Zero-Energy Villages (Lead PI) DST-SERD 3 Years 146.048 Lakhs Ongoing
8 Adapting Fused Deposition Modelling (FDM) technique for additive manufacturing of aluminium alloys in the semisolid state: Design and development of a novel prototype (Co-PI) DST-SERB 3 Years 37.09 Ongoing
9 Grid-tied multilevel photovoltaic inverter with batteries power balancing, (Role: Collaborator) JUICE Flexible Funding (UK) 1 Year Fund to Travel UK and Conduct Research (4000 Euros) Completed
10 UVC Disinfection Chamber (PI) IIT Bhubaneswar Special Project 3 Months 1.5 Lakhs Completed
Consultancy Project
1 Vetting of Schematic Drawing along with transmission loss calculation for 6.6KV/415V OHDC line. Megha Engineering & Infrastructure Ltd 2 months 0.33 Lakhs Completed
2 Vetting of Electrical and E&I Designs and Drawings for Rairakhol block of Sambalpur district of Odisha Project Voltas Limited 18 Months 4.13 Lakhs Completed
3 Vetting of Electrical and E&I Designs and Drawings for Bramhagiri & Krushnaprasad block of Puri district of Odisha Project Voltas Limited 18 Months 4.13 Lakhs Completed
4 Vetting of Electrical and E&M Designs and Drawings of Puri-Ganjam Project M/s GVPR ENGINEERS LIMITED 18 Months 6.195 Lakhs Ongoing
5 Vetting of Electrical and E&M Designs and Drawings of Nayagarh Project M/s GVPR ENGINEERS LIMITED 12 Months 4.425 Lakhs Ongoing
6 Vetting of Electrical and E&M Designs and Drawings of Nawarngpur Project M/s GVPR ENGINEERS LIMITED 9 Months 7.375 Lakhs Ongoing
7 Vetting of Electrical and E&M Designs and Drawings of Pertaining to nayagarh, Angul, Jajpur Project Kalpataru Projects International Limited 6 Months 10 lakhs Ongoing
8 Vetting of civil structural documents, electrical process, mechanical and instrumentation design and drawing of 3 Nos Individual Rural Piped water supply projects pertaining to Koraput and Navarangapur Districts Larsen and Toubro- Infrastructure Vertical 6 Months 27.43 Lakhs Ongoing
9 Execution of Rural Piped water supply project, pertaining to Ranipada Cluster of Banpur Block of Khurda District I/C five year of Operation and Maintenance UMSL Ltd 6 Months 1.48 lakhs Ongoing
Sl. No. Project Name Agency PI/CO-PI Duration Cost of the Project Completed/Not Completed
1 Virtual Class Room Development NKN, NIC PI 08/ 2010- 08/2012 119 Lakhs Completed
2 Speech-Based Access of Agricultural Commodity Prices and Weather Information in Indian Languages/ Dialects – Odiya Language DeitY, Govt. of India, PI 08/2014 – 08/2018 44.44 Lakhs Completed
3 Microwave-Optical Engineering and Sensing Laboratory DST-FIST PI 10/2018 – 10/2023 232 Lakhs Completed
4 Add on Radar for Jamming UAVs ATB Co-PI 11/2020 – 11/2023 78.19 Lakhs Completed
5 Bone health classification using machine learning SERB-CRG Co-PI 03/2021 – 05/2023 32.57 Lakhs Completed
6 Design and Development of a Software Defined Radar for Road Safety Applications MV-Govt of Odisha PI 03/2021 – 03/2023 14.78 Lakhs Completed
7 Design and Development of a Doppler Radar System for Inbore Measurement ARMREB-DRDO Co-PI 02/2022 – 02/2025 44.575 Lakhs Ongoing
8 Innovative Biosensor Platform Utilizing Hybrid Fiber Interferometry for Enhanced Performance SERB-CRG PI 02/2024 – 06/2026 24.02 Lakhs Ongoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 High directivity microstrip couplers using distributed realization of lumped elements IITBBS Seed Grant 2019 – 2021 10 lakhs Completed
2 Single chip testsets for portable network analyzers for 5G applications DST-SERB 2019 – 2023 63 lakhs Completed
3 Low cost, lightweight, USB controlled RF synthesizer using broadband band-pass filters with tunable passband DST-SERB 2024 – 2047 22 lakhs Ongoing
4 Development of Time domain measurement technique for very low frequency (10 MHz to 50 MHz) antenna radiation pattern measurements SAC-ISRO 2024 – 2026 29 lakhs Ongoing/approved; Sanction expected shortly
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Si/SiC Hybrid semiconductor based solid state transformer for PV application (PI) DST SERB 3 years 9 months ₹ 35.6L Completed
2 Comparison of control techniques for residential PV system with module based maximum power point tracking (PI) IIT Bhubaneswar 2 years ₹ 10 L Completed
3 Brush-Less DC Machine Based Solar Pumping System (co-PI): PI: Prof. C. N. Bhende DST 3 years ₹ 66 L Completed
4 Design and implementation of High-speed low-power embedded signal processor based custom power devices for power quality improvement (co-PI) PI: Dr. S B. Karanki DST 3 years ₹ 32 L Completed
5 Optimized Modulation for Triple Active Bridge Converter for Electric Vehicle Application with wide-band gap Semiconductor Devices (PI) DST SERB 3 years ₹ 36.5 L Ongoing
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1Design, development and analysis of integrated dual-output converter (IDOC) Technology for Renewable IntegrationR and D, IIT Bhubaneswar2 years10 LakhCompleted
2Quadratic boost converter based multi-input power converter for renewable applicationsStart-up Research Grant (SERB)2 years29.7 LakhCompleted
3Design, Development, and Demonstration of Solar-PV integrated On-board and Off-board Electric-Rickshaw Charging InfrastructureDepartment of Science and Technology- SERD3 years78.05 LakhOngoing
4Design and Development of Next Generation Cost Effective Reconfigurable On-Board Battery Charger with Health and Fault MonitoringMeiTY2 years63.04 LakhOngoing
5Development of adaptive motor controller for PMSM based three-wheeler Electric Vehicle (co-PI)MeiTY2 years10.0 LakhOngoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Design implementation and performance evaluation of algorithms for Compression of hyper-spectral data products, PI ISRO 2-1/2 years 11, 80, 000 /- Completed
2 Optimal solutions and applications for the next generation wireless Internet/PI Vodafone 4 years 46, 00,000/- Completed
3 Developing suitable pedagogical methods for various classes, intellectual calibers and research in e-learning, PI: A.K. Ray, Co-PIs: B. Bhattacharya, G.Saha, S. Mahapatra, K. Pathak MHRD 3-1/2 years 5,00,00,000.00/- Completed
4 Enabling Technologies for the design and implementation of next generation optical internet prototype based optical packet switching/Co-PI DST 3 Years 314, 000 /- Completed
5 Design of Systolic Algorithms for the Efficient Compression of Real-Time Data/PI DST 3 Years 642, 000 /- Completed
6 Systolic Design and Implementation of Coders for High-Speed Lossless Data Compression UISTRF/DST 2 Years 392, 400 /- Completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Achieving Reliable communications in the Internet of Things: An erasure correction coding approach DST-SERB 2 years 27 lakhs Completed
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1Speech enhancement for hearing impaired listeners (PI)DST5 years35 LakhOngoing
2Multi Channel speech enhancement and noise suppression using beamforming (PI)Seed grant2 years20 LakhOngoing
3Automated prediction of hearing loss and loudness growth curve using EEG signals (PI)SERB-SRG2 Years19,89,130 INROngoing
4Speech to Speech Translation for Tribal Languages using Deep Leaning Framework (Co-PI)MeITY3 Years44.53 LakhOngoing
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1Development of adaptive motor controller for PMSM based three-wheel Electric VehicleMinistry of Electronics and Information Technology, Govt. of India02 Years10 LakhsOngoing (Role : PI)
2Design and Development of Grid Interactive Adaptive Controls for Frequency Regulation from Large Scale Photovoltaic SystemsCentral Power Research Institute02 Years33.7 LakhsOngoing (Role : Co-PI)
3Development of cost-effective energy management strategies for a green hydrogen based electric vehicle charging stationDST-TARE03 Years23.5 LakhOngoing (Role : Mentor)
4Photovoltaic assisted water harvesting from moistureDST03 Years41.95 LakhOngoing (Role : Co-PI)
5Brushless DC Machine based Solar Pumping SystemDepartment of Science & Technology (DST)03 Years78 LakhsCompleted (Role : PI)
6Photovoltaic (PV) based grid-interactive and off-grid electricity system (Joint Indo-Finish project)Department of Science & Technology (DST)03 Years34.07 LakhsCompleted (Role : PI)
7Control of Stand-Alone hybrid “Solar-Diesel Generator-Battery” Power Supply SystemDST-SERB03 Years19.0 LakhsCompleted (Role : PI)
8Classification of Switched Capacitor in the Distribution NetworkIIT Bhubaneswar (Seed Money project)02 Years5.5 LakhsCompleted (Role : PI)
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Next Generation Algorithms for Video Anomalies KIST South Korea 2024-2025 19 Lakhs Approved
2 NETRAM: AI-Enabled System to Intelligently Select Visual Sensors Amidst Natural Instability IRDE, DRDO 2024-2026 41.42 Lakhs Approved
3 VISHLESHNAM: A Video Analytics Solution for Crowd Behaviour Analysis Using Multiple Sensors IRDE, DRDO 2024-2026 49.25 Lakhs Ongoing
4 Integration and Analysis of Advanced Machine Learning Algorithms with LACOS Codebase IKST Centre, Bangalore 2023-2024 25.77 Lakhs Ongoing
5 Designing of Computer Vision Guided Intelligent Traffic Systems for Smart Cities SERB 2021-2024 43.1 lakhs Ongoing
6 Designing of Algorithms for Pedestrian Attribute Learning and Recognition KIST, South Korea 24.75 Lakhs Completed
7 Implementation of Advanced Machine Learning Algorithms for Cluster Expansion IKST Centre, Bangalore 2019-2022 64.53 lakhs Completed
8 ANALYZING CO-OCCURRING ROAD AND TRAFFIC ANOMALIES USING DEEP LEARNING KIST, South Korea 2022-2023 18 Lakhs Completed
9 Development of Augmented Reality Guided Systems to Improve Class Room Teaching-Learning Process VARCoE 2021-2022 8.5 Lakhs Completed
10 Understanding Road Traffic and Pedestrian Anomalies KIST, South Korea 2021-2022 19.38 Lakhs Completed
11 Anomaly Detection in Videos KIST, South Korea 2020-2021 24.64 Lakhs Completed
12 Re-identification for Video Synopsis KIST, South Korea 2018-2019 36.2 Lakhs Completed
13 Designing of Video Synopsis Algorithms for Visual Surveillance KIST, South Korea 2017 16.82 Lakhs Completed
14 Analysis and Implementation of Non-chronological video synopsis and indexing IKST Centre, Bangalore 2016-2017 6 Lakhs Completed
15 Computer vision guided mass gathering surveillance using crowd flow analysis SERB 2016-2019 22.55 Lakhs Completed
16 Video Analytics Algorithms to Detect Unusual Behaviour in Crowds and Traffic OutDu Mediatech Pvt. Ltd. 2016 1.7 Lakhs Completed
17 C/C++ implementation with adequate GUI for sparsity based abnormal event detection IKST Centre, Bangalore 2016 7 Lakhs Completed
18 C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet processes IKST Centre, Bangalore 2016 8 Lakhs Completed
19 Development of a Computer Vision Assisted System to Facilitate Full Body Rehabilitation IIT Bhubaneswar 2014-2016 9.7 Lakhs Completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Light weight, Reconfigurable Cognitive Radio Platform for M2M and IoT applications IMPRINT 3 years 49.5 Lakhs Ongoing
2 Speech to Speech Translation for Tribal Languages using Deep Leaning Framework MeITY 3 Years 44.53 Ongoing
3 Design and implementation of MIMO based transceiver for emergency applications DST 3years 19.5 Laks Completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Diesel engine Emission Control using Electrical Discharge based Technique for Clean Environment: A Non-Conventional Approach DST 3.5 Years 52.58 Lakhs Completed
2 Solar Powered DC System for Domestic Electrification and Rural Application Executive Summary Project Report Planning & Coordination Dept., Odisha 2.2 years 21.66 Lakhs Completed
3 NOx Removal study by Electrical Discharge: Experimental and Theoretical Validation IIT Bhubaneswar 2 Years 10.00 Lakhs Completed
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 High-speed and energy efficient CMOS transceiver design for full-duplex chip-to-chip serial link DST-SERB 2 years 29.97 Completed
2 Receiver Equalizer design for lossy serial links in CMOS Technology IIT Bhubaneswar Seed Grant 2 years 10 Ongoing
Consultancy Project
1 Analog Design for Serial Link Ceremorphic Inc. 4 years 23.56 Ongoing
2 Analog CMOS circuit Design Marquee Semiconductor 4 months 1.6 Completed
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1Rigorous verification of Memory Systems using Statistical Model Checking (PI)MHRD3 years63 lakhsOngoing
2Testing of Simulink Models using Symbolic Constraint Solving (PI)IIT Bhubaneswar2 years8 lakhsCompleted
3Distributed SDN Controllers with end-to-end security (Co-PI)_Bharat Electronics Lab, Bangalore2 years42.5 lakhsCompleted
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1Real Time Implementation of Image Fusion Algorithms for IR and CCD VideoDRDO1.5 years10 lakhsCompleted
2Online Target Scoring System for Consistency Trials with Scintillation removal in imagesDRDO1.5 years9.8 lakhsCompleted
3Design and Development of Deep Learning based App for Early Warning of BlindnessSERB3 years26 lakhsOngoing
4Cancer Modelling of Signaling Network and Prediction of Therapeutic Intervention StrategiesDST2.5 years25 lakhsOngoing
5Proof of concept for co-ordinate determination of fall of shot from aerial imageryDRDO1.5 years9.9 lakhsOngoing
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1.Development of hybrid smart grid communications network or last mile connectivity: A D2D and PLC approachDST-SERB2019-202129.32 lakhsCompleted
2.Design of QoS-aware gateway for reliable IoT communication networksIIT Bhubaneswar2021-202310 lakhsOngoing
3.Proof of Concept for Coordinate Determination of Fall od Shot from Aerial ImageryPXE, DRDO2022-20239.9 lakhsOngoing
4.Elevating the Quality of Education in ICT towards 2030 through Multilateral CollaborationsUTFORSK2023-20273,000,000 NOK (Approx. Rs. 2.50 Cr.)Ongoing
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Modeling and Verification of 3D-Stacked Cache Memory Hierarchy for Heterogeneous System-On-Chip (SoC) Design IIT Roorkee 2 Years Rs. 20L Completed (PI)
2 Breaking the Memory Wall of High Performance Computing: Design and Analysis of 3D Stacked Cache SERB SRG 2 Years Rs. 31.56L Accepted (PI)
Sl. No.Project NameAgencyDurationCost of the ProjectCompleted/Not Completed
1Runtime Monitoring of (Timed) PropertiesIIT Bhubaneswar2 Years950000Completed (PI)
2Securing Implantable Medical Devices Using Formal MethodsMHRD4 Years6850000Completed (PI)
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Prediction of task-fMRI activation maps from resting state-fMRI and structural MRI to enhance clinical applicability of fMRI SERB-SRG 2 Years 19,47,000 Ongoing (PI)
2 fMRI activation map prediction from resting state data IIT Bhubaneswar 2 Years 20,00,000 Ongoing (PI)
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Heavy Metal Ion Detector System for Water Quality Monitoring SERB-SRG 2 Years 23,52,000 Ongoing (PI)
2 Self-powered Microsensors for Non-invasive Diabetes Monitoring IIT Bhubaneswar 2 Years 20,00,000 Ongoing (PI)
3 Portable Real-time Sensor Unit for Trace Level Explosive Detection DRDO 3 Years 39,22,000 Accepted (PI)
Sl. No. Project Name Agency Duration Cost of the Project Completed/Not Completed
1 Prototype of Imaging RADAR in UWB DST-IMPRINT 2 Years 72.82 L Completed
2 E3DCRM: Energy-Efficient Embedded Systems for Data-Driven Cardiac Rhythm Monitoring SPARC-MHRD 2 Years 72.12 L Completed (Co-PI)
3 DIVERSASIA: Embracing diversity in ASIA through the adoption of Inclusive Open Practices Erasmus 3 Years 88 L Completed
4 Energy Efficient Mesh Architecture Based Indigenous Neuromorphic Processor for Extreme Edge IoT C2S-Meity 5 Years 97.5 L Ongoing (Co-CI)