Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Design, Development and Demonstration of a Centralized Protection and Monitoring (CPM) System within a Distribution Substation including DER | Central Power Research Institute, Bangalore | 2023-2025 | 192.50 Lakhs | Not Completed |
2 | Centre of Excellence on Energy Aware Urban Infrastructure | SERB, Department of Science and Technology(Project Lead: IIT Kharagpur) | 2023-2028 | 49.04 Lakhs | Not Completed |
3 | Development of Coordinated Protection and Control Scheme for Microgrid | SERB Science and Technology Award for Research | 2022-2025 | 38.5 Lakhs | Not Completed |
4 | Development of Internet of Things Enabled Phasor and Power Quality Monitoring Devices for Smart Power Grids | Core Research Grant, SERB, DST | 2021-2024 | 29.24 Lakhs | Not Completed |
5 | Design and Development of Dynamic phasor and Frequency estimator complying IEEE C37.118 standard | Teachers Associateship for Research Excellence (TARE), SERB, DST | 2019-2023 | 18.3 Lakhs | Not Completed |
6 | Smart Grid Visualization–Applications of Virtual Reality | VARCoE, IIT Bhubaneswar | 2020-2023 | 20.0 Lakhs | Not Completed |
7 | Design and Development of Tools for Detection and Prevention of Cyber Attacks in Smart Grid Energy Management Systems (EMS) | CPRI Bangalore | 2019-2022 | 49.92 Lakhs | Completed |
8 | Design and Development of Low cost Time Synchronized devices for WAMs in Smart-Grids (IIT BBSR- Virginia Tech, USA) | SPARC, MHRD | 2019-2021 | 66. 26 Lakhs | Completed |
9 | INDO-US: US-India collaborative for smart distribution System with Storage | DST (India) –DoE (USA) consortia | 2017-2022 | 340 Lakhs | Completed |
10 | Brushless DC Machine based Solar pumping system | Solar Energy Research Initiative -2016, DST | 2017-2020 | 66.24 Lakhs | Completed |
11 | Development of intelligent relaying scheme for micro-grids with DG penetration | Central Power Research Institute, Bangalore | 2016-2019 | 28.00 Lakhs | Completed |
12 | Development of a comprehensive wide-area based back-up protection scheme for power transmission network, SERB | Department of Science and Technology, New Delhi | 2015-2018 | 50.328 Lakhs | Completed |
13 | Design and development of an adaptive distance relay for Flexible AC transmission systems | Department of Science and Technology, New Delhi, (Fast track project proposal for young scientist) | 2012-2015 | 18.89 Lakhs | Completed |
14 | House hold energy consumption survey | Warwick Manufacturing Group, UK | 2012 | 1.2 Lakhs | Completed |
15 | Vetting of CAPEX Plan of TPCODL | GRIDCO, Odisha | 2021 | 1.60 Lakhs | Completed |
16 | Submission of Analysis of the Project Specific Tariff of Lower Baitarani SHEP | GRIDCO, Odisha | 2022 | 3.61 Lakhs | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1. | Dynamic maximum power point tracking of grid connected photo voltaic (PV) system | 2012-2015 | 10 Lakhs | Completed | |
2 | Smart Grid Security Control Using Nature – Inspired Decentralised Cooperative Metaheuristic Strategies | DST – TARE | 2019-22 | 10.05 Lakhs | Completed |
3 | HUB and SPOKE consortium for 2W and 3W Electric Drives-Design, Development and Prototyping of advanced IM and Synshronous Reluctance Drives and Vehicle integration for e2W and e3W vehicle applications | NFTDC | 20.20 | 2018-20 | Completed |
4 | Driver behaviour modelling for autonomous driving | KPIT | 26.70 | 2017-20 | Completed |
5 | Solar Powered DC System for Domestic Electrification and Rural Application | Planning & Coordination Dept. | 21.66 | 2015-17 | Completed |
6 | Integration and intelligent management of renewable via ICT for smart Micro-Grid networks | DST | 88.24 | 2014-18 | Completed |
1. | Preparation of DPR for the proposed National Institute for New Energy & Innovation at Bhubaneswar | Ministry of New Renewable Energy, Govt. of India | 2015 | 05 Lakhs | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Design and Implementation of a Wireless Sensor Network Testbed. | IIT Bhubaneswar | 2 year | 10 Lacs | Completed |
2 | Design and Development of Efficient, Smart, and Scalable Communication Protocols for Large, and Heterogeneous IoT-System. | PMRF Funding | 5 years | 55 Lacs | Ongoing |
3 | Design and Development of an Efficient Framework for Decentralized Real-Time Coordination and Collaboration for a Swarm of Autonomous Robots | DST SERB CRG | 3 years | 30.2 Lacs | Ongoing |
4 | Lightweight reconfigurable cognitive radio platform for M2M and IoT applications (Co-PI) | IMPRINT-II, SERB, DST | 3 years | 81.98 Lacs | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Marquee Semiconductor MoU | Marquee Semiconductor | 2023-2027 | 49 Lakhs(varies) | Ongoing |
2 | Smart City Phase-2 | Ministry of Electronics and Information Technology (MeitY) Government of India | 2024-2027 | 402 Lakhs | Ongoing |
3 | Energy Efficient Mesh Architecture Based Indigenous Neuromorphic Processor for Extreme Edge IoT Applications | Ministry of Electronics and Information Technology (MeitY) Government of India | 2023-2028 | 288 Lakhs | Ongoing |
4 | Design of Dynamic MAC and PHY SoC for low power and long-range networks | Ministry of Electronics and Information Technology (MeitY) Government of India | 2020-2024 | 38 Lakhs | Ongoing |
5 | Simultaneous Bidirectional Data Link over On-Chip Global MIMO Interconnect | Carinthia University of Applied Sciences, Austria | 2017-2020 | 35 Lakhs | completed |
6 | In-Band Full-Duplex Signaling with Digitally Assisted Self-Interference Cancellation | UGC | 2017-2019 | 10 Lakhs | completed |
7 | Ideation in collaboration with Infineon Technologies | European Union | 2016-2019 | 338 Lakhs | completed |
8 | Design and Development of DRFM and Superbus Systems for Long Range Missiles | Advanced Systems Laboratory, Defense Research and Development Authority , Govt. of India | 2013-2014 | 49.25 | completed |
9 | Virtual Lab on Analog and Mixed Signal VLSI Design | MHRD | 2011-2014 | 15 | completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Techniques and Tools for verification of network security policies based on formal methods to assess security of networks | SAG, DRDO, Delhi | 10-03-2017 to 10-08-2019 | 27.95 | Completed |
2 | Design and Developments of Tools for Detection and Prevention of Cyber Attacks in smart grid EMS | CPRI, Bangalore | 02-11-2020 to 01-05-2024 | 49.92 | Ongoing |
3 | Development of Formal Verification Tools for Proactive Assessment and Prevention of Security Threats in Enterprise Networks | DRDO, Delhi | 03-10-2021 to 02-10-2024 | 38.64 | Ongoing |
4 | Distributed Software Defined Network Controller with End-to-End Security | Bharat Electronics Bangalore | 10-07-2018 to 09-01-2021 | 42.84 | Completed |
5 | Automated Security Verification and Diagnosis of Smart Grid Advanced Metering Infrastructure – a formal analytics based approach | IIT Bhubaneswar | 10-03-2014 to 09-03-2016 | 9.95 Lakhs | completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Efficient cache aided data delivery using deep reinforcement learning. PI | DST | 2 years | 18.03 lakhs | Completed |
2 | Optimization of Service Completion Time for Distributed Gradient Descent Algorithm in the Presence of Straggler Nodes. PI | IIT Bhubaneswar | 2 years | 10 lakhs | Completed |
3 | Design, Development, and Demonstration of Solar-PV On-board and Off-Board Electric Rickshaw Charging Infrastructure.” Co-PI | DST | 3 years | 78 lakhs | Ongoing |
4 | Classical and Quantum Error Correcting Codes and Mathematics over Finite Fields for Smart Telecommunications. Co-PI | DST | 3 years | 1,04,35,281 | Ongoing (Sanction Order released. Money yet to receive). |
5 | Communication Efficient Gradient Aggregation for Hierarchical Networks | DST | 3 years | 39,47,956 | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Effect of Fading Correlation on the Performance of Equal Gain Combining Receiver over Hoyt Fading Channels,. | DST | 2008-2011 | 10 Lac | Completed |
2 | Aeronautical Telemetry Estimation and Equalization, DRDO, ITR, Chandipur, 2016-2017 – PI – Ongoing. | DRDO, Chandipur | 2016-2018 | 10 Lac | Completed |
3 | Design and implementation of AI powered autonomous underwater vehicle (AUV) and IoT enabled underwater acoustic sensor networks | TIH, IIT Guwahati TIDF | 2022-2026 | 90 Lac | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1. | AI and ML based data analytics algorithm for Medtech System | Humor Tech Pvt. Ltd. | 2 Years | 2,00,000/- | Completed |
2. | Design and Performance Investigation of Negative Capacitance Tunnel FET for Digital/Analog Applications | FIG, PDPM IIITDM Jabalpur | 3 Years | 7,50, 000/- | Completed |
3. | Design and Performance Investigation of Low power III-V Negative Capacitance FE for sensing applications | CSIR | 3 Years | 29.21 lakh | Ongoing |
4. | Machine Learning Augmented Compact Modeling of a Cryogenic Nanosheet FET for implementing an Analog Front-end Readout Circuitry | SERB | 3 Years | 44 Lakh | Sanctioned |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Minimization of Storage Requirements in Renewable-Rich Microgrid Systems through Coordinated Control of Resources | SERB, DST, GoI under Early Career Research Award (Restructured Young Scientist) | 3 Years | 50,00,000 | Completed |
2 | Grid Interconnection protocols for largely dispersed minigrids/microgrids for electrification of rural India, | Indo-Norway Joint Research Projects on Renewable Energy, DST, GoI and Research Council of Norway | 3 Years | 40,00,000 from DST, GoI and NOK 24,56,746 (2 Crore approx.) from Research Council of Norway | Completed |
3 | Design and Development of Grid Interactive Adaptive Controls for Frequency Regulation from Large Scale PV Systems | Research Scheme on Power Project, Central Power Research Institute (CPRI), India | 3 Years | 39,16,000 | Ongoing |
4 | Reliability Enhancement in PV Rich Microgrids with Plug-in-Hybrid Electric Vehicles and Data Centres | European Union’s ERIGrid under H2020 | One Month | 6,90,000 (€ 8500) | Completed |
5 | Grid Interconnection protocols for Largely Dispersed minigrids/microgrids | European Union’s ERIGrid under H2020 | One Month | 12,00,000 (€ 14600) | Completed |
6 | Intelligent DC Microgrid | NIT Warangal | 3 Years | 5,00,000 | Completed |
7 | AUDIT FOR 33KV POWER SUPPLY WORK | IISER BERHAMPUR | 3 Months | 2,50,000 | Ongoing |
8 | AR-VR Based Application Modules for Learning, Manpower Training and Emergency Response in Electrical Substations | VARCoE, IIT Bhubaneswar | 3 years | 8,00,000 | 2024 |
9 | Vetting of Guidelines for Solar Powered Fencing | Dept. of Energy, Govt. of Odisha | 5 Months | 6,28,940 | 2024 |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Enhancement of the bandwidth of planar antennas using electromagnetic bandgap structures | DST | 03/2013 – 02/2016 | 4.4 Lakhs | Completed |
2 | Microwave-Optical Engineering and Sensing Laboratory | DST-FIST | 10/2018 – 10/2023 | 232 Lakhs | Completed |
3 | Add on Radar for Jamming UAVs | ATB | 11/2020 – 11/2023 | 78.19 Lakhs | Completed |
4 | Bone health classification using machine learning | SERB-CRG | 03/2021 – 05/2023 | 32.57 Lakhs | Completed |
5 | Design and Development of a Software Defined Radar for Road Safety Applications | MV-Govt of Odisha | 03/2021 – 03/2023 | 14.78 Lakhs | Completed |
6 | Design and Development of a Doppler Radar System for Inbore Measurement | ARMREB-DRDO | 02/2022 – 02/2025 | 44.575 Lakhs | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Power Quality Enhancement and Control of Distributed Generation in Grid Interactive Systems (PI) | SEED Grant IIT Bhubaneswar | 2 years | 10 Lakhs | Completed |
2 | Brush Less DC Machine based solar pumping system (Co-PI) | DST | 3 years | 66.24 Lakhs | Completed |
3 | Design and Development of Affordable Movable Solar Photo-voltaic Water Pumping System (PI) | RKVY, Odisha State Govt | 4 Years | 80.58 Lakhs | Completed |
4 | UK India Clean Energy Research Institute (WP-4) (Institute Lead-PI) | DST | 4.5 Years | 54.73 Lakhs | Completed |
5 | Design and Implementation of High Speed Low Power Embedded Signal Processor Based Custom Devices for PQ Improvement (PI) | DST-SERB | 3 Years | 32.99 Lakhs | Completed |
6 | Renewable Energy EMPOWERing European and InDian communities (RE-EMPOWERED) (Institute PI and Demo Site Coordinator (Keonjhar, Odisha) | DST | 3.5 Years | 158.15 Lakhs | Ongoing |
7 | Design and Development of Cost-Effective Floating-Solar Energy Generation Technologies and Infrastructure for Achieving Nearly Zero-Energy Villages (Lead PI) | DST-SERD | 3 Years | 146.048 Lakhs | Ongoing |
8 | Adapting Fused Deposition Modelling (FDM) technique for additive manufacturing of aluminium alloys in the semisolid state: Design and development of a novel prototype (Co-PI) | DST-SERB | 3 Years | 37.09 | Ongoing |
9 | Grid-tied multilevel photovoltaic inverter with batteries power balancing, (Role: Collaborator) | JUICE Flexible Funding (UK) | 1 Year | Fund to Travel UK and Conduct Research (4000 Euros) | Completed |
10 | UVC Disinfection Chamber (PI) | IIT Bhubaneswar Special Project | 3 Months | 1.5 Lakhs | Completed |
1 | Vetting of Schematic Drawing along with transmission loss calculation for 6.6KV/415V OHDC line. | Megha Engineering & Infrastructure Ltd | 2 months | 0.33 Lakhs | Completed |
2 | Vetting of Electrical and E&I Designs and Drawings for Rairakhol block of Sambalpur district of Odisha Project | Voltas Limited | 18 Months | 4.13 Lakhs | Completed |
3 | Vetting of Electrical and E&I Designs and Drawings for Bramhagiri & Krushnaprasad block of Puri district of Odisha Project | Voltas Limited | 18 Months | 4.13 Lakhs | Completed |
4 | Vetting of Electrical and E&M Designs and Drawings of Puri-Ganjam Project | M/s GVPR ENGINEERS LIMITED | 18 Months | 6.195 Lakhs | Ongoing |
5 | Vetting of Electrical and E&M Designs and Drawings of Nayagarh Project | M/s GVPR ENGINEERS LIMITED | 12 Months | 4.425 Lakhs | Ongoing |
6 | Vetting of Electrical and E&M Designs and Drawings of Nawarngpur Project | M/s GVPR ENGINEERS LIMITED | 9 Months | 7.375 Lakhs | Ongoing |
7 | Vetting of Electrical and E&M Designs and Drawings of Pertaining to nayagarh, Angul, Jajpur Project | Kalpataru Projects International Limited | 6 Months | 10 lakhs | Ongoing |
8 | Vetting of civil structural documents, electrical process, mechanical and instrumentation design and drawing of 3 Nos Individual Rural Piped water supply projects pertaining to Koraput and Navarangapur Districts | Larsen and Toubro- Infrastructure Vertical | 6 Months | 27.43 Lakhs | Ongoing |
9 | Execution of Rural Piped water supply project, pertaining to Ranipada Cluster of Banpur Block of Khurda District I/C five year of Operation and Maintenance | UMSL Ltd | 6 Months | 1.48 lakhs | Ongoing |
Sl. No. | Project Name | Agency | PI/CO-PI | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|---|
1 | Virtual Class Room Development | NKN, NIC | PI | 08/ 2010- 08/2012 | 119 Lakhs | Completed |
2 | Speech-Based Access of Agricultural Commodity Prices and Weather Information in Indian Languages/ Dialects – Odiya Language | DeitY, Govt. of India, | PI | 08/2014 – 08/2018 | 44.44 Lakhs | Completed |
3 | Microwave-Optical Engineering and Sensing Laboratory | DST-FIST | PI | 10/2018 – 10/2023 | 232 Lakhs | Completed |
4 | Add on Radar for Jamming UAVs | ATB | Co-PI | 11/2020 – 11/2023 | 78.19 Lakhs | Completed |
5 | Bone health classification using machine learning | SERB-CRG | Co-PI | 03/2021 – 05/2023 | 32.57 Lakhs | Completed |
6 | Design and Development of a Software Defined Radar for Road Safety Applications | MV-Govt of Odisha | PI | 03/2021 – 03/2023 | 14.78 Lakhs | Completed |
7 | Design and Development of a Doppler Radar System for Inbore Measurement | ARMREB-DRDO | Co-PI | 02/2022 – 02/2025 | 44.575 Lakhs | Ongoing |
8 | Innovative Biosensor Platform Utilizing Hybrid Fiber Interferometry for Enhanced Performance | SERB-CRG | PI | 02/2024 – 06/2026 | 24.02 Lakhs | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | High directivity microstrip couplers using distributed realization of lumped elements | IITBBS Seed Grant | 2019 – 2021 | 10 lakhs | Completed |
2 | Single chip testsets for portable network analyzers for 5G applications | DST-SERB | 2019 – 2023 | 63 lakhs | Completed |
3 | Low cost, lightweight, USB controlled RF synthesizer using broadband band-pass filters with tunable passband | DST-SERB | 2024 – 2047 | 22 lakhs | Ongoing |
4 | Development of Time domain measurement technique for very low frequency (10 MHz to 50 MHz) antenna radiation pattern measurements | SAC-ISRO | 2024 – 2026 | 29 lakhs | Ongoing/approved; Sanction expected shortly |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Si/SiC Hybrid semiconductor based solid state transformer for PV application (PI) | DST SERB | 3 years 9 months | ₹ 35.6L | Completed |
2 | Comparison of control techniques for residential PV system with module based maximum power point tracking (PI) | IIT Bhubaneswar | 2 years | ₹ 10 L | Completed |
3 | Brush-Less DC Machine Based Solar Pumping System (co-PI): PI: Prof. C. N. Bhende | DST | 3 years | ₹ 66 L | Completed |
4 | Design and implementation of High-speed low-power embedded signal processor based custom power devices for power quality improvement (co-PI) PI: Dr. S B. Karanki | DST | 3 years | ₹ 32 L | Completed |
5 | Optimized Modulation for Triple Active Bridge Converter for Electric Vehicle Application with wide-band gap Semiconductor Devices (PI) | DST SERB | 3 years | ₹ 36.5 L | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Design, development and analysis of integrated dual-output converter (IDOC) Technology for Renewable Integration | R and D, IIT Bhubaneswar | 2 years | 10 Lakh | Completed |
2 | Quadratic boost converter based multi-input power converter for renewable applications | Start-up Research Grant (SERB) | 2 years | 29.7 Lakh | Completed |
3 | Design, Development, and Demonstration of Solar-PV integrated On-board and Off-board Electric-Rickshaw Charging Infrastructure | Department of Science and Technology- SERD | 3 years | 78.05 Lakh | Ongoing |
4 | Design and Development of Next Generation Cost Effective Reconfigurable On-Board Battery Charger with Health and Fault Monitoring | MeiTY | 2 years | 63.04 Lakh | Ongoing |
5 | Development of adaptive motor controller for PMSM based three-wheeler Electric Vehicle (co-PI) | MeiTY | 2 years | 10.0 Lakh | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Design implementation and performance evaluation of algorithms for Compression of hyper-spectral data products, PI | ISRO | 2-1/2 years | 11, 80, 000 /- | Completed |
2 | Optimal solutions and applications for the next generation wireless Internet/PI | Vodafone | 4 years | 46, 00,000/- | Completed |
3 | Developing suitable pedagogical methods for various classes, intellectual calibers and research in e-learning, PI: A.K. Ray, Co-PIs: B. Bhattacharya, G.Saha, S. Mahapatra, K. Pathak | MHRD | 3-1/2 years | 5,00,00,000.00/- | Completed |
4 | Enabling Technologies for the design and implementation of next generation optical internet prototype based optical packet switching/Co-PI | DST | 3 Years | 314, 000 /- | Completed |
5 | Design of Systolic Algorithms for the Efficient Compression of Real-Time Data/PI | DST | 3 Years | 642, 000 /- | Completed |
6 | Systolic Design and Implementation of Coders for High-Speed Lossless Data Compression | UISTRF/DST | 2 Years | 392, 400 /- | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Achieving Reliable communications in the Internet of Things: An erasure correction coding approach | DST-SERB | 2 years | 27 lakhs | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Speech enhancement for hearing impaired listeners (PI) | DST | 5 years | 35 Lakh | Ongoing |
2 | Multi Channel speech enhancement and noise suppression using beamforming (PI) | Seed grant | 2 years | 20 Lakh | Ongoing |
3 | Automated prediction of hearing loss and loudness growth curve using EEG signals (PI) | SERB-SRG | 2 Years | 19,89,130 INR | Ongoing |
4 | Speech to Speech Translation for Tribal Languages using Deep Leaning Framework (Co-PI) | MeITY | 3 Years | 44.53 Lakh | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Development of adaptive motor controller for PMSM based three-wheel Electric Vehicle | Ministry of Electronics and Information Technology, Govt. of India | 02 Years | 10 Lakhs | Ongoing (Role : PI) |
2 | Design and Development of Grid Interactive Adaptive Controls for Frequency Regulation from Large Scale Photovoltaic Systems | Central Power Research Institute | 02 Years | 33.7 Lakhs | Ongoing (Role : Co-PI) |
3 | Development of cost-effective energy management strategies for a green hydrogen based electric vehicle charging station | DST-TARE | 03 Years | 23.5 Lakh | Ongoing (Role : Mentor) |
4 | Photovoltaic assisted water harvesting from moisture | DST | 03 Years | 41.95 Lakh | Ongoing (Role : Co-PI) |
5 | Brushless DC Machine based Solar Pumping System | Department of Science & Technology (DST) | 03 Years | 78 Lakhs | Completed (Role : PI) |
6 | Photovoltaic (PV) based grid-interactive and off-grid electricity system (Joint Indo-Finish project) | Department of Science & Technology (DST) | 03 Years | 34.07 Lakhs | Completed (Role : PI) |
7 | Control of Stand-Alone hybrid “Solar-Diesel Generator-Battery” Power Supply System | DST-SERB | 03 Years | 19.0 Lakhs | Completed (Role : PI) |
8 | Classification of Switched Capacitor in the Distribution Network | IIT Bhubaneswar (Seed Money project) | 02 Years | 5.5 Lakhs | Completed (Role : PI) |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Next Generation Algorithms for Video Anomalies | KIST South Korea | 2024-2025 | 19 Lakhs | Approved |
2 | NETRAM: AI-Enabled System to Intelligently Select Visual Sensors Amidst Natural Instability | IRDE, DRDO | 2024-2026 | 41.42 Lakhs | Approved |
3 | VISHLESHNAM: A Video Analytics Solution for Crowd Behaviour Analysis Using Multiple Sensors | IRDE, DRDO | 2024-2026 | 49.25 Lakhs | Ongoing |
4 | Integration and Analysis of Advanced Machine Learning Algorithms with LACOS Codebase | IKST Centre, Bangalore | 2023-2024 | 25.77 Lakhs | Ongoing |
5 | Designing of Computer Vision Guided Intelligent Traffic Systems for Smart Cities | SERB | 2021-2024 | 43.1 lakhs | Ongoing |
6 | Designing of Algorithms for Pedestrian Attribute Learning and Recognition | KIST, South Korea | 24.75 Lakhs | Completed | |
7 | Implementation of Advanced Machine Learning Algorithms for Cluster Expansion | IKST Centre, Bangalore | 2019-2022 | 64.53 lakhs | Completed |
8 | ANALYZING CO-OCCURRING ROAD AND TRAFFIC ANOMALIES USING DEEP LEARNING | KIST, South Korea | 2022-2023 | 18 Lakhs | Completed |
9 | Development of Augmented Reality Guided Systems to Improve Class Room Teaching-Learning Process | VARCoE | 2021-2022 | 8.5 Lakhs | Completed |
10 | Understanding Road Traffic and Pedestrian Anomalies | KIST, South Korea | 2021-2022 | 19.38 Lakhs | Completed |
11 | Anomaly Detection in Videos | KIST, South Korea | 2020-2021 | 24.64 Lakhs | Completed |
12 | Re-identification for Video Synopsis | KIST, South Korea | 2018-2019 | 36.2 Lakhs | Completed |
13 | Designing of Video Synopsis Algorithms for Visual Surveillance | KIST, South Korea | 2017 | 16.82 Lakhs | Completed |
14 | Analysis and Implementation of Non-chronological video synopsis and indexing | IKST Centre, Bangalore | 2016-2017 | 6 Lakhs | Completed |
15 | Computer vision guided mass gathering surveillance using crowd flow analysis | SERB | 2016-2019 | 22.55 Lakhs | Completed |
16 | Video Analytics Algorithms to Detect Unusual Behaviour in Crowds and Traffic | OutDu Mediatech Pvt. Ltd. | 2016 | 1.7 Lakhs | Completed |
17 | C/C++ implementation with adequate GUI for sparsity based abnormal event detection | IKST Centre, Bangalore | 2016 | 7 Lakhs | Completed |
18 | C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet processes | IKST Centre, Bangalore | 2016 | 8 Lakhs | Completed |
19 | Development of a Computer Vision Assisted System to Facilitate Full Body Rehabilitation | IIT Bhubaneswar | 2014-2016 | 9.7 Lakhs | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Light weight, Reconfigurable Cognitive Radio Platform for M2M and IoT applications | IMPRINT | 3 years | 49.5 Lakhs | Ongoing |
2 | Speech to Speech Translation for Tribal Languages using Deep Leaning Framework | MeITY | 3 Years | 44.53 | Ongoing |
3 | Design and implementation of MIMO based transceiver for emergency applications | DST | 3years | 19.5 Laks | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Diesel engine Emission Control using Electrical Discharge based Technique for Clean Environment: A Non-Conventional Approach | DST | 3.5 Years | 52.58 Lakhs | Completed |
2 | Solar Powered DC System for Domestic Electrification and Rural Application Executive Summary Project Report | Planning & Coordination Dept., Odisha | 2.2 years | 21.66 Lakhs | Completed |
3 | NOx Removal study by Electrical Discharge: Experimental and Theoretical Validation | IIT Bhubaneswar | 2 Years | 10.00 Lakhs | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | High-speed and energy efficient CMOS transceiver design for full-duplex chip-to-chip serial link | DST-SERB | 2 years | 29.97 | Completed |
2 | Receiver Equalizer design for lossy serial links in CMOS Technology | IIT Bhubaneswar Seed Grant | 2 years | 10 | Ongoing |
1 | Analog Design for Serial Link | Ceremorphic Inc. | 4 years | 23.56 | Ongoing |
2 | Analog CMOS circuit Design | Marquee Semiconductor | 4 months | 1.6 | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Rigorous verification of Memory Systems using Statistical Model Checking (PI) | MHRD | 3 years | 63 lakhs | Ongoing |
2 | Testing of Simulink Models using Symbolic Constraint Solving (PI) | IIT Bhubaneswar | 2 years | 8 lakhs | Completed |
3 | Distributed SDN Controllers with end-to-end security (Co-PI)_ | Bharat Electronics Lab, Bangalore | 2 years | 42.5 lakhs | Completed |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Real Time Implementation of Image Fusion Algorithms for IR and CCD Video | DRDO | 1.5 years | 10 lakhs | Completed |
2 | Online Target Scoring System for Consistency Trials with Scintillation removal in images | DRDO | 1.5 years | 9.8 lakhs | Completed |
3 | Design and Development of Deep Learning based App for Early Warning of Blindness | SERB | 3 years | 26 lakhs | Ongoing |
4 | Cancer Modelling of Signaling Network and Prediction of Therapeutic Intervention Strategies | DST | 2.5 years | 25 lakhs | Ongoing |
5 | Proof of concept for co-ordinate determination of fall of shot from aerial imagery | DRDO | 1.5 years | 9.9 lakhs | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1. | Development of hybrid smart grid communications network or last mile connectivity: A D2D and PLC approach | DST-SERB | 2019-2021 | 29.32 lakhs | Completed |
2. | Design of QoS-aware gateway for reliable IoT communication networks | IIT Bhubaneswar | 2021-2023 | 10 lakhs | Ongoing |
3. | Proof of Concept for Coordinate Determination of Fall od Shot from Aerial Imagery | PXE, DRDO | 2022-2023 | 9.9 lakhs | Ongoing |
4. | Elevating the Quality of Education in ICT towards 2030 through Multilateral Collaborations | UTFORSK | 2023-2027 | 3,000,000 NOK (Approx. Rs. 2.50 Cr.) | Ongoing |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Modeling and Verification of 3D-Stacked Cache Memory Hierarchy for Heterogeneous System-On-Chip (SoC) Design | IIT Roorkee | 2 Years | Rs. 20L | Completed (PI) |
2 | Breaking the Memory Wall of High Performance Computing: Design and Analysis of 3D Stacked Cache | SERB SRG | 2 Years | Rs. 31.56L | Accepted (PI) |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Runtime Monitoring of (Timed) Properties | IIT Bhubaneswar | 2 Years | 950000 | Completed (PI) |
2 | Securing Implantable Medical Devices Using Formal Methods | MHRD | 4 Years | 6850000 | Completed (PI) |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Prediction of task-fMRI activation maps from resting state-fMRI and structural MRI to enhance clinical applicability of fMRI | SERB-SRG | 2 Years | 19,47,000 | Ongoing (PI) |
2 | fMRI activation map prediction from resting state data | IIT Bhubaneswar | 2 Years | 20,00,000 | Ongoing (PI) |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Heavy Metal Ion Detector System for Water Quality Monitoring | SERB-SRG | 2 Years | 23,52,000 | Ongoing (PI) |
2 | Self-powered Microsensors for Non-invasive Diabetes Monitoring | IIT Bhubaneswar | 2 Years | 20,00,000 | Ongoing (PI) |
3 | Portable Real-time Sensor Unit for Trace Level Explosive Detection | DRDO | 3 Years | 39,22,000 | Accepted (PI) |
Sl. No. | Project Name | Agency | Duration | Cost of the Project | Completed/Not Completed |
---|---|---|---|---|---|
1 | Prototype of Imaging RADAR in UWB | DST-IMPRINT | 2 Years | 72.82 L | Completed |
2 | E3DCRM: Energy-Efficient Embedded Systems for Data-Driven Cardiac Rhythm Monitoring | SPARC-MHRD | 2 Years | 72.12 L | Completed (Co-PI) |
3 | DIVERSASIA: Embracing diversity in ASIA through the adoption of Inclusive Open Practices | Erasmus | 3 Years | 88 L | Completed |